Factsheets, Plans and Map, Review Report
Reclamation Proposals in Victoria Harbour
Central Reclamation Phase III (CRIII)
Size of reclamation proposed | Town plans involved | Features |
---|---|---|
18 hectares | Approved Central District (Extension) Outline Zoning Plan No. S/H24/6 (Exhibited for public inspection on 27 December 2002) | The CRIII will provide land for construction of transport infrastructure comprising the Central-Wan Chai Bypass, the Airport Railway Extended Overrun Tunnel, the MTRCL North Hong Kong Island Line and other supporting road networks. A world-class waterfront promenade will be provided along the new waterfront for public enjoyment. |
Wan Chai Development Phase II (WDII)
Size of reclamation proposed | Town plans involved | Features |
---|---|---|
About 12.7 hectares |
Approved Wan Chai North Outlined Zoning Plan No. S/H25/2 Approved North Point Outline Zoning Plan No. S/H8/22 (Both exhibited for public inspection on 22 May 2009) Approved Central District (Extension) Outline Zoning Plan No. S/H24/6 |
The WDII will provide land for the construction of the Central-Wan Chai Bypass, the Island Eastern Corridor Link and other roads. It will also accommodate the MTRCL Shatin to Central Link and the North Hong Kong Island Line. A continuous waterfront promenade will be provided along the new waterfront for public enjoyment. |
Ends